EAST LIVERPOOL TERMINALS


This convenient location consists of two separate warehouse sites --State Line and Little England-- and a centrally located office that services both facilities. The State Line site is a U.S. Customs bonded warehouse. Both sites operate as storage, transfer, and warehousing facilities capable of processing, crushing, screening, and packaging of materials.

State Line Facility
The State Line site is located at 101 State Route 68, Midland, Pa., 15059, along the northern bank of the Ohio River near milepost 40.4. The site covers approximately 92 acres of land, approximately half of which is located in the State of Ohio. The site uses 28 covered storage and processing buildings and extensive outside asphalt and concrete storage pads for storing bulk and packaged materials.

Little England Facility
The Little England site is located off of St. George Street, East Liverpool, Oh., 43920, along the northern bank of the Ohio River near milepost 41.7. This site covers approximately 8.5 acres of land with three covered storage and processing buildings. The site also provides outside concrete storage pads for storing bulk and packaged materials.

Material Handling
Both sites have the capability to handle bulk and packaged products such as:

  • Ferro Alloys
  • Pig Iron, Silicon Carbide, Silicon Metal, Fluorspar, Magnesite
  • Primary Metals (zinc, aluminum, lead, tin, copper, and nickel)
  • Specialty Alloys
  • Refractory products
  • Scrap Metal
  • Minerals
  • Steel products
  • Fertilizer

Receiving and Shipping 
Receiving and shipping of materials at both sites is accomplished through three modes of transportation:

  • River Barge: The State Line site has three loading and unloading river docks equipped with two cranes and one hydraulic backhoe. The Little England site has one loading and unloading river dock equipped with a crane.
  • Truck: The State Line site uses six van/container docks and the Little England site uses one van/container dock with no restrictions on flatbed capability at both sites.
  • Railroad: The State Line site uses a 30-car siding for handling hopper-cars, boxcars, gondolas, and flatcars with a Norfolk Southern connection.

Material Drying System
The State Line site operates a Material Drying System capable of drying materials in accordance with customer moisture requirements.

The daily operations of the terminal are managed by:
V.P. of Operations, Rusty Davis

Terminal Manager, Gary Smith
Office Manager, Doris Thayer

S.H. Bell Company East Liverpool Facility 
2217 Michigan Ave.
East Liverpool, Ohio 43920

• Phone: 1-330-385-5083
• FAX: 1-330-385-8120
• Operations e-Mail: orders.eliv@shbellco.com

For sales information contact:
Adam Bell, Pittsburgh-Based Sales Manager
Jill Tillman, Manager Sales Administration

For rate information contact the Pittsburgh Administrative office:
• Phone: 1-412-963-9910
• Fax: 1-412-963-1206